Marina Consultancy for Eastside Project, Gibraltar
Marina Projects's role includes providing specific guidance on all marina related issues with input into the master planning, detailed design and associated Environmental Impact Assessment. Topics covered include the following:
Marina infrastructure requirements
Wave climate and design dredge depths
Concept design for the marina
Market assessment and berth mix analysis
Services and fuelling strategy
Boutique cruise liner berth
Strategy for the delivery of services and fuel
Security and communications
Marina valuation and selection of optimum marina scheme
Phasing of the marina development
In total the scheme will incorporate up to 2,200 apartments, a 500 berth marina with 'boutique' cruise liner berth and terminal and a 300 bed 4-star hotel. The professional team includes Halcrow consulting engineers and Foster's Architects. The development programme is anticipated to extend over a 10-year period and will result in inward investment into Gibraltar exceeding £1 billion.
Commenting on the appointment of Marina Projects, Geoff Phillips, Development Director said, "I am delighted that MCB (Gibraltar) has selected Marina Projects as specialist marina consultant for this prestigious scheme. We look forward to working with the client and other members of the professional team and I anticipate Marina Projects will be playing a full part in bringing forward this ambitious project."
Author Information
Mike Ward
MARINA PROJECTS LIMITED

